Construction Scheduling Software Built for Real Execution

Plan, coordinate, and control schedules with Gantt charts, master schedules, and linked trade schedules. Connect tasks to inspections, observations, and punch lists so progress updates automatically from the field.

What is construction scheduling?

Construction scheduling is the process of planning, organizing, and controlling construction activities over time. It defines what tasks need to be done, when they start and finish, their dependencies, and who is responsible — ensuring projects are delivered in a controlled and predictable way.

Common scheduling challenges

  • Schedules disconnected from field execution
  • Manual updates that don’t reflect real progress
  • One schedule for everyone creates conflicts
  • No link between inspections, punch lists, and tasks
  • Limited visibility across trades and companies
  • Static plans that become outdated quickly

How Modunex Scheduling works

Gantt-based planning (WBS)

  • Visual timelines
  • Hierarchical tasks
  • Phases and milestones
  • Clear task ownership

Dependencies and constraints

  • Task relationships
  • Project constraints
  • Controlled schedule changes

Project calendars

  • Working days and holidays
  • Project calendars
  • Trade-specific calendars when needed

Multi-company collaboration

  • Owner, GC, subs
  • Role-based permissions
  • Company-level visibility control

Master schedules and linked trade schedules

Large projects rarely operate on a single schedule. Trades and specialties need to plan independently without breaking the overall plan. Modunex supports master schedules linked to trade and specialty schedules so teams can work in parallel without conflicts.

Master schedule (source of truth)

Defines major phases, contractual dates, and milestones. Protects the overall project timeline.

Linked trade schedules

Each trade plans its detailed work (electrical, concrete, finishes) while staying aligned to the master.

Parallel work without conflicts

Because schedules are linked (not merged), teams can plan without overwriting each other.

Visibility and progress roll-up

Progress from trade schedules can roll up into the master schedule for real-time visibility.

From Gantt planning to real field execution

In Modunex, the Gantt is not only planning. Tasks can be linked to inspections, observations, and punch list items so real field execution drives progress and automatic task completion.

Link tasks to inspections and punch lists

  • Generate inspections from tasks
  • Create linked punch items
  • Assign teams and owners

Progress driven by real work

  • Closing punch items updates % complete
  • Completing inspections advances the task
  • Open observations can block progress

Configurable progress rules per task

  • Each inspection = 25%
  • All closed = 100%
  • Mixed rules by task type

Automatic completion in the Gantt

  • Less manual updates
  • Higher accuracy
  • Real-time visibility

Why execution-driven scheduling matters

  • Schedules reflect real field progress
  • Fewer coordination errors
  • More accountability by team/trade
  • Better forecasting and control
  • Decisions backed by real execution data

Most tools stop at planning. Modunex connects planning with execution.

Built for what comes next

Proactive preparation

Future capabilities to create inspections or related items X days before a task and notify teams in advance.

Condition-based restrictions

Designed to prevent tasks from starting until requirements are met: inspections, approvals, safety, quality.

Rule-based automation

Automate actions like task lock/unlock, readiness, and linked item creation based on rules.

Roadmap capabilities may evolve based on project needs.

Who uses Modunex scheduling?

  • Project Managers
  • Construction Managers
  • Superintendents
  • Planning Engineers
  • Owners & PMOs
  • Contractors & Subcontractors

Construction scheduling FAQs

Can Gantt tasks be connected to inspections and punch lists?

Yes. In Modunex, tasks can be linked to inspections, observations, and punch list items so progress updates automatically based on field execution.

Does Modunex support master schedules and linked schedules?

Yes. You can create a master schedule and link trade/specialty schedules so teams work in parallel without conflicts.

Is it suitable for large infrastructure projects?

Yes. Modunex is designed to scale from small projects to complex multi-company programs.

Start planning with confidence

Move beyond static schedules. Connect planning, execution, and automation in a single platform.