Fast start-up. Data you own. Everyone onboarded.

Every company on your project, working as one from day one.

Fast project start-up, effortless onboarding for every GC, trade, designer, and owner, and data that stays yours. Run RFIs, submittals, specs, drawings, and BIM coordination in one connected platform.

Connect with your tools.

Autodesk / BIM 360

BIM

Procore

Project Mgmt

Revit

Models

AutoCAD

Drawings

Power BI

Reporting

MS Project

Schedule

Navisworks

Clash Detection

P6

Primavera P6

Planning

TEKLA

Tekla

Steel

Bentley

Infrastructure

IFC

IFC

Open BIM

Autodesk / BIM 360

BIM

Procore

Project Mgmt

Revit

Models

AutoCAD

Drawings

Power BI

Reporting

MS Project

Schedule

Navisworks

Clash Detection

P6

Primavera P6

Planning

TEKLA

Tekla

Steel

Bentley

Infrastructure

IFC

IFC

Open BIM

About Modunex

A platform built by people who know construction

Modunex was designed from the ground up with general contractors, specialty trades, and owners who deliver real projects. Every feature is built around the realities of construction — not theoretical workflows.

From project start-up to field execution, we make it effortless to bring every company onto the job and keep the entire documentation and coordination lifecycle in one platform, with your data always yours.

360°
Traceability
100%
Cloud-native
6
Core modules
About the platform
app.modunex.com
Menu
Modunex TechnologiesModunex Technologies
Jordan Shawjordan.shaw@modunex.com
JS

Company level

Modunex
Modunex Technologies·TUESDAY, JUNE 9

Good morning, Jordan.

5 active projects · 24 open RFIs · 6 items past due across the portfolio.
Open items
59
73 total
RFIs
24
of 27 total
Submittals
18
of 19 total
Punch
8
of 18 total
Corresp.
9
of 9 total
Past due
6
items overdue
Project status board
Health · risk · open items per project
On trackAt riskCritical
Blue Horizon Wind Farm
BHWF-TX-2026
Critical
32
Open
34%
Progress
$185.0M
Contract
A-2 Motorway Expansion · Guadalajara–Alcalá
A2-GUA-ALC-2026
At risk
8
Open
12%
Progress
$145.0M
Contract
New Satellite Terminal · Valencia Airport
VLC-TERM-2026
On track
7
Open
6%
Progress
$220.0M
Contract
Puerta del Sol Residential Complex
PRS-MAD-2026
On track
6
Open
28%
Progress
$68.0M
Contract
SkyLink International Terminal Expansion
ATL-SKY-2026
On track
6
Open
16%
Progress
$1.0M
Contract
Workload heatmap
Open items per module · by project
Project
RFIs
Submittals
Punch
Corresp.
BIM
Total
Blue Horizon Wind Farm
18
11
10
2
41
A-2 Motorway Expansion · Guadalajara–Alcalá
3
2
2
2
9
New Satellite Terminal · Valencia Airport
2
2
2
2
8
Puerta del Sol Residential Complex
2
2
2
1
7
SkyLink International Terminal Expansion
2
2
2
2
8
Highest-impact items right now
RFI· RFI-012
Electrical conduit damage during excavation
Blue Horizon Wind Farm
12d late
PUNCH· #1
HEB-240 beam twist at joint J-07
New Satellite Terminal · Valencia
12d late
RFI· RFI-014
Unsafe condition — open trench without protection
Blue Horizon Wind Farm
12d late
RFI· RFI-008
Access road alignment deviation
Blue Horizon Wind Farm
11d late
PUNCH· #1
Moisture at facade joint — basement slab -2
Puerta del Sol Residential Complex
6d late
PUNCH· #1
Crack in retaining wall PK 13+600
A-2 Motorway Expansion
2d late

Ready to get everyone on your project working as one? Start today.

app.modunex.com
Menu
Modunex TechnologiesBlue Horizon
Jordan Shawjordan.shaw@modunex.com
JS

Project level

Completion Walks

Track and manage construction completion walks with GPS-based checkpoints and photo documentation

New Verification Walk
Total Walks3
Draft0
In Progress0
Completed3
Search walks…
Status
Location
Walk NameWalk TypeLoc.TradeStatusScheduledStartCompletedFromToActions
WTG Line B Completion WalkTurbine Completion WalkDrenajeCompletedMay 30, 2026May 28, 2026 5:57 AMWTG-07WTG-12
Substation and Access Road Completion WalkGeneral VerificationDrenajeCompletedMay 31, 2026May 28, 2026 5:57 AMSubstation YardMain Access Road
WTG Line A Completion WalkTurbine Completion WalkTurbinas EólicasCompletedMay 29, 2026May 28, 2026 5:57 AMWTG-01WTG-06
Walk Details

WTG Line B Completion Walk

CompletedTurbine Completion Walk

Completion walk from WTG-07 to WTG-12.

This walk is completed and is currently read-only.
4
Checkpoints
0
Photos
Satellite imagery of WTG-07 to WTG-12 completion walk route
Start
End
1
2
3
4
+
Satellite
500 m

Walk Summary

Location
Started
CompletedMay 28, 2026 5:57 AM
Created ByJordan Shaw
Start Point-22.493007, -68.817682
End Point-22.479262, -68.817962

Checkpoints

4
1

Checkpoint 1

May 28, 2026 5:51 AM Jordan Shaw
active

Checkpoint 1 for WTG Line B Completion Walk.

Related Punch Items0No related punch items.
2

Checkpoint 2

May 28, 2026 5:51 AM Jordan Shaw
active

Checkpoint 2 for WTG Line B Completion Walk.

Related Punch Items0No related punch items.
3

Checkpoint 3

May 28, 2026 5:51 AM Jordan Shaw
active

Checkpoint 3 for WTG Line B Completion Walk.

Related Punch Items0No related punch items.
4

Checkpoint 4

May 28, 2026 5:51 AM Jordan Shaw
active

Checkpoint 4 for WTG Line B Completion Walk.

Related Punch Items0No related punch items.
Why Modunex

Execution quality that can't be beaten

Verify completion in the field with GPS-located walks, photo evidence, and checkpoints that turn what happens on site into a traceable record.

Every finding pinned to the map

Each checkpoint is GPS-located on the project map, so observations are tied to an exact spot on site.

Evidence, not assumptions

Capture photos and notes at each checkpoint and link them to punch items for full traceability.

From walkthrough to closeout

Track every walk from draft to completed, with a locked read-only record once verification is done.

Explore this feature
The platform in action

Our project results speak for themselves

From spec PDF to structured submittals

Upload a specification PDF and Modunex Intelligence extracts sections, divisions, and requirements — ready to turn into submittals and track all the way to approval.

  • Auto-extract CSI sections and metadata from any spec PDF.
  • Generate submittals straight from the spec, with full traceability.
  • Keep every revision and approval connected in one place.

Start with a pilot project. Validate execution in weeks.

LinkedIn

From our LinkedIn

Follow on LinkedIn